Workplace Inspections

One of the major aspects of the role of the JHSC is to inspect the workplace. Inspections are carried out on a monthly basis by all members of the JHSC.

Team 1: Brian & Becky
Team 2: Kathleen & Rob
Team 3: Matt & Grace
Team 4: Scott & Elizabeth

Area A: Seminary 1st & 2nd Floors, Courtyard & Basement

Area B: Hall of Missions, Gym, Library, Bookstore/Muffin Shop, UC 2nd floor (NOT Dining Hall or Kitchen), Parking Lot

Area C: Reception through Student Life, Business Wing, Boiler Room, Garages, Dining Hall & Kitchen

Area D: Bayview Campus: Basement, 1st Floor, 3rd Floor & Parking Lots

DATE TYPE TEAM 1 TEAM 2 TEAM 3 TEAM 4
January 12 Basic C D A B
February 9 Basic C D A B
March 9 Basic D A B C
April 13 Thorough        
May 11 Basic        
June 8 Basic        
July 13 Basic        
August 10 Thorough        
September 14 Basic        
October 12 Basic        
November 9 Basic        
December 14 Thorough